Brooklyn, Kings County

Water damage restoration that starts with a classification, not a fan

Category decides what gets removed. Class decides what equipment goes in. Both get written down before work begins, because that record is what closes the job and what an adjuster reads.

CoverageKings County
Building stockRow house to loft
StandardANSI/IICRC S500
DocumentationDaily readings
02 / Where the water comes from

Brooklyn has three water problems that look alike and are not

Sewer surcharge

Most of the borough drains on a combined sewer. In heavy rain the pipe fills and the lowest opening in the building becomes the relief point. That water is Category 3 the moment it enters. It is removed, not dried.

Supply line failure

A braided hose, an angle stop, a radiator valve, a riser joint. Clean water that becomes contaminated by what it crosses. In a row house it travels through the floor assembly and the party wall, so the wet area is larger than the visible stain.

Groundwater and grade

Slab seepage, areaway runoff, a high water table near the bay. Slow, repeated and usually a drainage defect rather than a restoration problem. Drying handles the interior. A plumber and a waterproofing contractor handle the cause.

A wet wall does not dry because the pipe was fixed.

Assessment and a written scope before any work begins.

Request a crew
04 / Verification

What to ask any Brooklyn restoration contractor

DCWP home improvement license. New York City requires it for residential repair work over $200. Check the number at nyc.gov/dcwp or through 311. Do not accept a state registration from another county as a substitute.

Article 32 mold licenses. New York licenses mold assessment and mold remediation separately. The assessor who clears the job should not be the company that performed the work. Check both at the New York State Department of Labor mold program.

A written contract over $500. State law requires the start and completion dates, a description of work and materials, the price, a three business day cancellation notice, and an escrow notice for deposits.

A scope with measurements. Square footage by room and material, the category and class with a reason, the equipment count, and the expected number of drying days. If a contractor cannot put those on paper before equipment arrives, the scope is a guess.

05 / Documentation

What a finished job leaves behind

A moisture map, dated photographs before demolition and at close, a materials removal list, daily psychrometric readings per material, an equipment log, and a scope with measurements. That package belongs to the property owner whether or not a claim is filed.

We do not issue a dry standard certificate on appearance. The certificate follows readings in the dry standard range for that assembly, held on consecutive days.

A scope that survives review carries Measured area, by room and material Category and class, with the reason Daily readings and equipment log Photographs before removal and at close
Request a callback